Client NBPPL UNCHAHAR
Sector Thermal Power
Project Interconnection Path from Existing Plant (Stage-II) upto Coal Bunker (Stage-IV) for CHP Package for 1X500 MW, FGUTPP
Capacity 1200 TPH (Rated) 1370 TPH (Design)
Consultants NTPC

Scope of Work

Supply & Erection of Conveyor Packaging of Coal Handling Plant

Major Equipment

  • Belt Conveyors
  • Belt Width-1400 mm
  • Length: 2.4 km